These rules have been developed by the International Bridge Building Committee for the Forty-Ninth International Bridge Building Contest to be held on Saturday, April 17 in Bellingham, Washington, USA.

For information about the International Contest contact the Northwest Region Director, Chuck Schelle at charles.schelle@bellinghamschools.org or event host, Paul Clement at paul.clement@bellinghamschools.org.

This is a contest for individual high school students, not teams. The object of this contest is to see who can design, construct and test the most efficient bridge within the specifications. Model bridges are intended to be simplified versions of real-world bridges, which are designed to permit a load to travel across the entire bridge. In order to simplify the model bridge design process, the number of loading positions is reduced, and to allow the contest to proceed in a reasonable amount of time, only one loading position is actually tested. These simplifications do not negate the requirement that the bridge must be designed to accept a load at any of the positions. Bridges determined by the judges to not meet this requirement will be disqualified and tested as unofficial bridges.


1. Materials
  1. The bridge must be constructed only from the official 3/32 inch square cross-section basswood included in the kit and any commonly available adhesive.
  2. The offical basswood may be notched, cut, sanded or laminated in any manner but must still be identifiable as the original official basswood.
  3. No other materials may be used. The bridge may not be stained, painted or coated in any fashion with any foreign substance.
2. Construction
  1. The bridge mass shall be no greater than 25.00 grams.
  2. The bridge (see Figure 1) must span a gap (S) of 300. mm, be no longer (L) than 400. mm, be no wider (W) than 80. mm, and be no taller (H) than 150. mm above the support surfaces.
  3. There are two horizontal and parallel load planes, the lower (P1) being no less than 20. mm above the support surface and the upper (P2) being no less than 70. mm above the support surface. A bar with square cross section 1.5" x 1.5" (38.1 mm x 38.1 mm) must be able to pass continuously along each load plane for the entire length of the bridge.
  4. The bridge must be constructed to provide a horizontal support for the loading plate (see section 3b) at each of the four loading locations (two on each load plane) 50. mm on either side of the center of the 300. mm span (see Figure 1) along the longitudinal axis of the bridge and at the center of the width of the bridge.
  5. No part of the bridge may extend below the support surfaces.
3. Loading
  1. The load will be applied downward, from below, by means of a 40. mm square plate (see Figure 2). The plate will have a thickness (t) of at least 6 mm but less than 13 mm and will have an up to 9.53 mm (3/8 inch) diameter threaded rod attached from below at its center with a standard hex nut. The plate will be horizontal with two sides parallel to the longitudinal axis of the bridge.
  2. The load will be applied on the longitudinal axis of the bridge at one of the four loading points: 50. mm on either side of the center on one of the two load planes (P1 and P2).
  3. On the day of the competition, the judges will randomly decide which of the three loading positions will be used; it will be the same for all bridges.
4. Testing
  1. On the day of the competition, contestants will place their bridge on the testing machine support surfaces, with threaded rod projecting from below at the designated loading position.
  2. Bridges will be tested in order of mass, starting with highest and finishing with lowest mass.
  3. The loading plate will be placed from above on the threaded rod with two sides parallel to the longitudinal axis of the bridge and secured with a hex nut.
  4. The load will be applied from below, with the contestant rotating the Vernier testing machine load wheel until bridge failure is sensed (see 4d). Competition loading will stop at 50. kg.
  5. Bridge failure is defined as the inability of the bridge to carry additional load as sensed by the Vernier testing machine.
  6. The bridge with the highest structural efficiency, E, will be declared the winner. Bridges failing above 50. kg will be considered to have held 50. kg for efficiency calculation.

E = Load supported in grams (50,000g maximum) / Mass of bridge in grams

5. Qualification
  1. All construction and material requirements will be checked prior to testing. Bridges failing to meet these requirements will be disqualified. If physically possible, disqualified bridges may be tested as exhibition bridges at the discretion of the builder and the contest directors.
  2. If, during testing, a condition becomes apparent (i.e., use of ineligible materials, inability to support the loading plate, bridge optimized for a single loading point, etc.) which is a violation of the rules or prevents testing as described above in Section 4, that bridge shall be disqualified.
  3. Decisions of the judges are final; these rules may be revised as experience shows the need. Please check our web site, http://bridgecontest.phys.iit.edu after February 12, 2027, to learn whether any changes have been made.



Last update: November 12, 2026
 [ Bridge Contest Home ] [ International Contest ] [ Chicago Regional Contest ]
 [ Region Locator ] [ Official Documentation ] [ Other Bridge Links ]

For further information, contact: Prof. Carlo Segre - segre@illinoistech.edu, Illinois Institute of Technology
© International Bridge Building Committee, 2024